Project Costs
$350,000
______
Start Date
March 1994
______
Completion Date
January 2008
|
Budget Rent-A-Car Site
Contamination Remediation
|
|
Scope
BCI staff, then part of Insight Environmental Services, Inc., were retained to define and remediate a release from an Underground Storage Tank (UST), which was discovered and reported in March 1994 when gasoline was observed on the water in a drainage ditch adjacent to the site property boundary. When examined, the on-site storm sewer catch basins also contained free product. The portion of the UST system believed to be the source of the release was the underground product piping. An Initial Assessment Report was submitted on behalf of Budget Rent-A-Car to the Michigan Department of Environmental Quality (MDEQ). The UST piping and pump dispenser was removed and a new UST system installed.
During site assessment activities to delineate the extent of residual soil contamination, free product was discovered in the groundwater at an approximate depth of 20 feet below the ground surface. Monitoring wells were installed to delineate the extent of groundwater impacted above applicable cleanup criteria, and soil borings were advanced to delineate the residual soil impacts. A total fluids pump and treat system was designed and installed on the property in order to recover impacted groundwater and free product, remediate the groundwater and control the migration of the contaminant plume. Over 7.5 million gallons of impacted groundwater were recovered and treated at the site. Site closure was approved by MDEQ in January 2008.
|
|