As home to one of the nation’s most renowned earth dam experts, BCI has been a reliable source for dam safety and design for more than 30 years. Our projects have included earth dam/ reservoir design, seepage/ stability analysis, dam safety training and inspections, erosion protection and armoring, dam breach analysis, soil cement and roller compacted concrete design, flood modeling, and more. BCI successfully completed the design and construction administration of the first reservoir in Florida to be funded by a public/ private partnership at a substantial cost-savings from original estimates to all stakeholders involved.
|
BCI, with Mock, Roos & Associates, Inc., designed the Section 24 Impoundment and related features and facilities. The design was completed in accordance with South Florida Water Management District (SFWMD) and U.S. Army Corps of Engineers (USACE) requirements for dam design. The project includes the design of a Wellington standard electric infl ow pump station (PS9); design of infl ow/outfl ow water control structures; design of conveyance infrastructure; design of a levee system capable of containing required stormwater volumes; design of a wetland/park system consistent with the master plan; and all associated construction services.
|
|
Read more...
|
As the top ranked consultant with the South Florida Water Management District (SFWMD), BCI has provided technical support to District personnel with numerous dam related challenges. BCI recently completed a scope of work under this contract which required staff to develop proprietary designs to assist with wildlife entrapment issues within armored reservoirs. BCI presented alternatives to District and USACE staff that alleviated the identifi ed problem while still maintaining the performance criteria of the reservoir.
|
|
Read more...
|
Southwest Florida Water Management District (SWFWMD) maintains several water control structures along the Winter Haven Chain of Lakes in Polk County. BCI has provided comprehensive professional engineering services to Kisinger Campo & Associates (KCA) and SWFWMD associated with the structures. One such structure assessed was the Lake Fannie Berm adjacent to the P-7 structure.
|
|
Read more...
|
The Martin Cooling Pond is a 6,900 acre reservoir located east of Lake Okeechobee and north of the St. Lucie Canal in Martin County. The reservoir has an embankment length of 17.5 miles with a maximum design head of 23 feet. Soon after filling, seepage was observed along the downstream slope along nearly 60 percent of the enhancement perimeter. Extensive sand boils developed within the toe ditch and around the pumping station resulting in failure of the embankment.
|
|
Read more...
|
|
BCI has provided comprehensive professional services to Cemex Construction Materials for more than twenty years. Those services have included design, permitting, construction monitoring and performance evaluation of earth dams used for water storage and disposal of mine tailings at an active limestone quarry.
|
|
Read more...
|
In 2003 the South Florida Water Management District (SFWMD) decided to pursue a dual track for the Everglades Agricultural Area (EAA) Reservoir Project. While the Project Delivery Team, led by the U.S. Army Corps of Engineers (USACE), continued with the development of the Project Implementation Report, the SFWMD proceeded with the reservoir design.
|
|
Read more...
|
South Florida Water Management District’s (SFWMD) Loxahatchee Reservoir is a critical component of the Comprehensive Everglades Restoration Plan (CERP), and is one of the fi rst public/private projects initiated. This 1,000- acre water storage area was created in a former limerock mining area providing 44,500-acrefeet of storage. BCI was retained by Palm Beach Aggregates to provide comprehensive design support and serve as the engineer of record.
|
|
Read more...
|
BCI was hired by Southwest Florida Water Management District (SWFWMD) to design and implement dredging for seven miles of the Leslie Hefner Canal and install a new water control structure on Moccasin Slough to restore drainage flow ways and improve navigability. BCI developed a detailed dredging plan characterizing the quantity/quality of material to be dredged. Due to the limited number of disposal sites, dredged material was piped several miles; transport was completed without the use of booster pumps. Two upland disposal area sites were constructed using perimeter embankments.
|
|
Read more...
|
BCI completed standard penetration test (SPT) borings and sampling of a gypsum stack slope that was moving. We installed slope indicator instrumentation and provided recommendations to improve slope stability.
|
|
Read more...
|
The Southwest Florida Water Management District (SWFWMD) maintains several structures along the Winter Haven Chain of Lakes in Polk County. BCI has provided comprehensive professional engineering services to Kisinger Campo & Associates (KCA) and the SWFWMD associated with these structures. As problems arise with the structures, BCI performs geotechnical evaluations and investigations of the structures to assess existing conditions.
|
|
Read more...
|
The Southwest Florida Water Management District (SWFWMD) maintains several structures along the Winter Haven Chain of Lakes in Polk County. BCI has provided comprehensive professional engineering services to Kisinger Campo & Associates (KCA) and the SWFWMD associated with the structures. One such structure assessed was the Lake Fannie Berm adjacent to the P-7 structure.
|
|
Read more...
|
The Lake Grady Road & Bridge District retained BCI to perform the comprehensive engineering and permitting services for the rehabilitation of Lake Grady's dam and spillway. Based on historical data, BCI conducted a site-specific geotechnical and structural investigation.
|
|
Read more...
|
The Medard Reservoir is classified as a high hazard dam within the State of Florida. BCI has provided comprehensive professional engineering services to Kisinger Campo & Associates (KCA) and Southwest Florida Water Management District (SWFWMD) associated with the Medard Reservoir. Those services have included dam breach and downstream fl ood routing analyses associated with the construction of the emergency overfl ow spillway.
|
|
Read more...
|
BCI has provided comprehensive professional services to Rinker Materials for more than twenty years. Those services have included design, permitting, construction monitoring and performance evaluation of earth dams used for water storage and disposal of mine tailings.
|
|
Read more...
|
Ten Mile Creek Reservoir is a critical component of the Comprehensive Everglades Restoration Program (CERP). The purpose of the reservoir and associated Stormwater Treatment Area (STA) is to restore historic flows and water quality to Ten Mile Creek, which flows into the St. Lucie Estuary. The project will help to reduce damaging freshwater discharges to the estuary and enhance the ability to maintain appropriate salinity in the estuary. Ten Mile Creek embankment is classified as a high hazard dam due to the proximity of important life support structures immediately downstream, and the potential for loss of life in the event of a failure.
|
|
Read more...
|
Lake Okeechobee occupies about 730 square miles in the center of the southern part of Florida. The Herbert Hoover Dike was constructed by the U.S. Army Corps of Engineers (USACE) in the 1930s to act as a levee and provide flood protection for surrounding agricultural lands and settlements. It is approximately 140 miles long, and up to 36 feet high. For some 30 years the Dike has been functioning as a dam, as increased demands for water in south Florida have resulted in higher lake impoundment levels.
|
|
Read more...
|
|
|
|
|