h01 Logo Logo h03
BCI Engineers and Scientists
Print E-mail
Water Resources Projects - Geographic Information Systems

Client
South Florida Water Management District
______

Location
Kissimmee, Florida
_________

Key BCI Staff
Walter Reigner, PE, CPESC
Michael Timpe, PE

______

Project Costs
$300,000
______

Start Date
1996 
______

Completion Date
1999

Kissimmee River
Restoration

Scope

kissimmeeriver-02.jpg
  • Conducted detailed residential flood Impact evaluation of upper Kissimmee River Chain of Lakes as a result of change in regulation schedule required to support Kissimmee River Restoration.

  • Developed ARCinfo GIS database to locate, characterize, and dimension thousands of residential dwellings, roads, septic tanks, docks, drainage systems, and other improvements.

  • Collected data using GPS technology and data loggers with pre-defined dictionaries.

  • Used GIS to assess degree of impact at various water level ranges.

  • Developed and evaluated complete costs associated with incremental impacts to define optimal cost/benefit relationship.

  • Developed alternative floodproofing feasibility options that could be implemented to mitigate expected impacts.

      kissimmeeriver-01.jpg
 
< Prev   Next >
   
BCI Engineers & Scientists, Inc.  © 2007
Corporate Headquarters : 2000 E. Edgewood Dr., Suite 215, Lakeland, FL 33803 | 877-550-4224