|
Client
City of Lakeland
TBE Group
______
Location
Polk County, Florida
______
Key BCI Staff
Walter Reigner, PE, CPESC
Leslie Bromwell, ScD, PE
Stephen Hjelle, PE
Richard Powers, PG, CPG
Jim Bailey
Scott Nyhof, PG, CPG
______
Project Costs
$60,000
______
Start Date
January 2002
______
Completion Date
2006
|
Edgewood Drive
Extension
|
|
Scope
BCI was retained by TBE Group and the City of Lakeland to provide a geotechnical assessment as part of an evaluation of one potential corridor for the proposed Edgewood Drive Extension in Lakeland, Florida. The purpose of the proposed extension is to provide a much needed east-west connection between Florida Avenue and Hardin Boulevard.
The subsurface soil exploration program utilized Standard Penetration Test (SPT) borings, flight auger borings, hand auger borings and hand penetrometer probes to identify in-situ soil conditions. Split spoon samplers and shelby tubes were used to obtain disturbed and undisturbed soil samples. Laboratory testing consisted of tests for consolidation characteristics, strength, cohesion, water content, organic content, Atterberg limits and sieve analysis. Wetlands delineation services were also included as part of the assessment.
|
|