h01 Logo Logo h03
BCI Engineers and Scientists
Print E-mail
Civil Engineering Projects - Government/Municipal/Redevelopment

Client
City of Plant CIty
______

Location
Plant City, Florida
______

Key BCI Staff
Walter Reigner, PE, CPESC
Timothy Kelly, PE
Timothy Howard
Stephen Kuhn, PE
Stephen Hjelle, PE
Doug Partington
Rebecca Rokitowski, EI
David Butcher, PE
Eric Brown
Kyle Compton
Kelly Kneeland
Thad Ellington
Mark Jones
George Drace 

______

Project Costs
Engineering: $133,000
Construction: $2.3 Million
______

Start Date
May 2006
______

Completion Date
Ongoing 

Master Engineering Services 

Scope

Master Engineering Services - Plant City

  • Evers Street Streetscape Project
    Project included reconstruction of two blocks of Evers Street to provide for reconstructed sidewalks with brick pavement accents. Design included accommodating ADA requirements and permitting through the Florida Department of Transportation (FDOT). Completed November 2007. Costs: $23,000 (eng. & permitting); $130, 000 (const)
  • Softball Stadium Complex Stormwater Management System Retrofit Project
    Project requires converting a high maintenance underdrain filtration  system to a permanent pool wet detention system to help the City eliminate the operating funds that would have been required for reconstruction and future operation of the underdrain system.  Project includes bathymetric data gathering and permitting through the Southwest Florida Water Management District (SWFWMD). Ongoing. Costs: $5,300 (eng. & permitting); $2,000 (maintenance const)
  • Baker Street Lighting Project
    Project included preparation of plans for the installation of architectural street lighting to match lighting in adjacent streetscaped areas. Tasks included managing the surveyor and lighting subconsultants and developing design drawings for construction.  Completed August 2007. Costs: $10,000 (eng.); $50,000 (const)
  • East Side Canal Stabilization Project
    Project entails resurfacing a section of the canal slopes with stabilized surfaces for erosion protection, aesthetics and long-term hydraulic performance. Tasks will include data collection, geotechnical engineering, modeling, permitting through HCEPC, SWFWMD and the City of Plant City. Ongoing –completion projected for May 2009. Costs: $65,000 (eng.); TBD (const)
  • Ellis-Methvin Park Project
    Project includes design, permitting and construction management assistance for the park improvements that include eight athletic fields, a two-acre stormwater facility/lake, parking and associated amenities. Ongoing. Costs: $30,000 (eng.); $2.1 million (const)

 Master Engineering Services - Plant City

 