Water Resources Projects -
Modeling/TMDL/Watershed Management
|
|
Client
PCS Phosphate Company, Inc.
______
Location
Hamilton County, Florida
_________
Key BCI Staff
Walter Reigner, PE, CPESC
Michael Timpe, PE
______
Project Costs
~$1 million
______
Start Date
1979
______
Completion Date
2004
|
PCS Mine-wide
Hydrologic Modeling
|
|
Scope
BCI completed detailed event and continuous modeling of 120,000-acre mine property to support Life-of-Mine permit approval through the Florida Department of Environmental Protection (FDEP) and the U.S. Army Corps of Engineers (USACE).
BCI performed the following tasking in support of the Life-of-Mine permit:
- Conducted integrated modeling of select basins within critical environmental settings
-
Utilized ArcInfo family GIS product to conduct overlay analysis and mapping in support of modeling and mines/reclamation planning
-
Assessed groundwater impacts and local stream base flow using continuous HSPF and MODFLOW modeling
-
Conducted detailed hydraulics of the Upper Suwannee River Basin using HEC-RAS to assess flood impacts
-
Developed a detailed map set of all hydrologic-related thematic maps, mining sequencing, reclamation plans, wetland locations and character, etc.
The project demonstrates BCI’s ability to provide comprehensive hydrologic, hydraulic and integrated modeling, GIS database development, reclamation and mine planning, and regulatory permitting services.
|
|