Civil Engineering Projects -
Stormwater
|
|
Client
Florida Department of Transportation District 7
______
Location
Temple Terrace, Florida
__________
Key BCI Staff
Walt Reigner, PE, CPESC
Timothy Kelly, PE
Ted Smith, PG, CPG
______
Project Costs
$51,000
______
Start Date
February 2000
______
Completion Date
April 2003
|
56th Street Continuous
Deflection Separation Unit
|
|
Scope
This project included the design, permitting, and plans preparation for the placement of a Continuous Deflection Separation (CDS) Unit in a highly urbanized basin in Temple Terrace. A 60-inch outfall pipe discharging into the Hillsborough River was considered a high priority outfall, since the City of Tampa pulls its drinking water from the river. There was no available property for more traditional BMP types, and this BMP was considered the most appropriate for the location and conditions.
Tasks included contamination assessment, pollutant load estimation for the basin, survey and drainage design, and maintenance of traffic, permitting, and construction specifications.
|
|