h01 Logo Logo h03
BCI Engineers and Scientists
Print E-mail
Civil Engineering Projects - Stormwater

Client
City of New Smyrna Beach
______

Location
New Smyrna Beach, Florida
__________

Key BCI Staff
Walter Reigner, PE, CPESC
Terry Dykehouse, PE
Timothy Kelly, PE
 

______

Project Costs
$25,000
______

Start Date
June 2006
______

Completion Date
August 2006

Comprehensive Lakes & Stormwater Management Consultant

Scope

 Central Beach Phase II Peer Review

BCI was selected by the City of New Smyrna Beach to perform a peer review for the Central Beach Flood Mitigation Phase II project designed by ECT, Inc. The project designed by ECT included plans and specifications for paving 5,000 feet of existing shell road and adding curb inlets, CDS units, pumps, and a generator to alleviate flooding problems.

BCI reviewed the plans and specifications for appropriateness of the application and quality assurance.  We proposed and evaluated alternatives to the existing plans for alleviating the flooding.  All alternatives were evaluated from the standpoint of capital cost, maintenance cost, permitting, project scheduling and delays, and citizen concerns.

A report was prepared for the city and a presentation of the results was delivered at a public meeting. This project involved the following elements:

  • Peer Review
  • Value Engineering
  • Flood Modeling
  • Cost Estimating
Central Beach Phase II Peer Review
 
< Prev   Next >
   
BCI Engineers & Scientists, Inc.  © 2007
Corporate Headquarters : 2000 E. Edgewood Dr., Suite 215, Lakeland, FL 33803 | 877-550-4224