Civil Engineering Projects -
Stormwater
|
|
Client
City of Sebring
______
Location
Sebring, Florida
_________
Key BCI Staff
Michael Timpe, PE
Jie Gao, EI
Aziza Khan
______
Project Costs
$47,445
______
Start Date
June 2006
______
Completion Date
December 2007
|
Stormwater Utility Development
|
|
Scope
BCI was hired to assist in the development and implementation of a citywide stormwater utility for the City of Sebring. BCI performed the following tasking:
-
Prepared stormwater inventory of stormwater ponds, pipes, inlets, outfalls, ditches and swales
-
Conducted stormwater needs assessment
-
Developed stormwater Capital Improvements Program (CIP)
-
Prepared parcel mapping and impervious area assessment
-
Developed equivalent stormwater unit
-
Developed initial rate algorithm and fee
-
Prepared billing database
-
Assisted with data preparation for mock billing
-
Prepared five and ten-year cost and revenue projections
-
Assisted with draft ordinance for stormwater utility
-
Coordinated with City’s cooperative funding partner
-
Prepared Comprehensive Report
|
|