Civil Engineering Projects -
Stormwater
|
|
Client
Lake County Department of Public Works
______
Location
Clermont, Florida
_________
Key BCI Staff
Walter Reigner, PE, CPESC
Terry Dykehouse, PE
Terese Gregg, EI
Jeff Leahy
Brian Manley
______
Project Costs
$100,000
______
Start Date
July 2006
______
Completion Date
Ongoing
|
Elbert Street Stormwater Improvements
|
|
Scope
BCI was hired by Lake County to improve water quality discharges to the Palatlakaha Chain of Lakes, particularly discharges to Lake Minnehaha. There is existing direct discharge from Elbert Street in a residential area retrofit with French drains and a splash pool upstream of a wetland fringe on Lake Minnehaha.
BCI is providing the following for stormwater improvements:
-
Pollutant loading and pollutant reduction calculations
-
Resolution of Conflicting survey easements required, vacation of existing easements, accommodating existing utilities, and saving existing trees
-
Coordination with residents for design and location of retrofit system
-
Wetland delineation
-
French drain design
-
Pavement repair design
-
Plans preparation
-
Permitting through SJRWMD
-
Erosion and sediment control plan
-
Construction inspections
-
Cost estimating
|
|