h01 Logo Logo h03
BCI Engineers and Scientists
Print E-mail
Civil Engineering Projects - Stormwater

Client
Southwest Florida Management District
______

Location
City of Polk City, City of Auburndale, and Polk County Incorporated Area, Florida 
__________

Key BCI Staff
Walter Reigner, PE, CPESC
John Kiefer, PE, PWS
Michael Timpe, PE
Jie Gao, EI
Kiran Maroju, EI
 
 

______

Project Costs
$66,000
______

Start Date
December 2006
______

Completion Date
Ongoing

Polk City Watershed
Management Plan

Scope

Polk City Watershed Management

BCI was selected by the Southwest Florida Water Management District to develop a watershed management plan (WMP) for the Polk City watershed. This project is currently in the study phase, which involves the gathering of all available hydrologic and hydraulic data for preparing the building of hydrologic model. The modeling phase of the project will start at the beginning of 2008.

The WMP is developed based on the Water Management District’s new guidelines and specifications for conducting watershed management plans.  These guidelines were developed jointly by FEMA and the SWFWMD and require rigorous quality control and a high degree of correspondence between the GIS database/mapping element and the associated hydrologic model parameterization and connectivity.

The general purpose of the WMP is to develop a plan that helps water managers to make decisions and design planning programs based on the information generated from the watershed evaluation. The WMP consists of the following tasks: digital topographic information, watershed evaluation, hydrological modeling, flood analysis, floodplain delineation, Digital Flood Insurance Rate Map (DFIRM) generation, surface water resource assessment, and alternative analysis for selection of Best Management Practices (BMPs).

 polkwm-01.jpg
 
< Prev   Next >
   
BCI Engineers & Scientists, Inc.  © 2007
Corporate Headquarters : 2000 E. Edgewood Dr., Suite 215, Lakeland, FL 33803 | 877-550-4224