Civil Engineering Projects - Stormwater

Client
Lake County Department of Public Works
______

Location
Clermont,  Florida
_________

Key BCI Staff
Walter Reigner, PE, CPESC
Terry Dykehouse, PE
Terese Gregg, EI
Jeff Leahy
Brian Manley 

______

Project Costs
$80,000
______

Start Date
July 2006
______

Completion Date
March 2008

Shore Drive Stormwater Improvements

Scope

BCI was hired by Lake County to  improve water quality discharges to Johns Lake. There is existing direct discharge from Shore Drive in a residential area retrofit with swales and ditch blocks upstream of the wetland fringe on the lake.

BCI is providing the following for stormwater improvements:

  • Pollutant loading and pollutant reduction calculations
  • Easements required,  accommodating existing utilities, and saving existing trees 
  • Coordination with residents for design and location of retrofit system
  • Wetland delineation
  • Curb and curb inlet design
  • Pavement repair design
  • Plans preparation
  • Permitting exemptions through SJRWMD
  • Erosion and sediment control plan
  • Construction inspections
  • Cost estimating